Various activities and works executed during the last quarter are as follows:

Works completed
  • 1. Civil.
    • (a) Community Hall No. I – As desired by Society, a partition steel grill to secure the S/Pool area has been completed. The S/Pool alongwith CC-I has been offered to Society to take over for usage.
    • (b) Community Hall No. II along with Swimming Pool work completed.
    • (c) Open Amphitheatre over Podium near Airmen/Sailor block completed.
    • (d) Water bodies along with water fountain works completed.
    • (e) Water irrigation system along with Sprinkler system completed. Functional tests are under progress.
    • (f) All civil works in common areas of Towers ‘K’ & ‘O’ are nearing completion. These Towers would be offered after joint inspection by Project Director & Architect in third week of Sep 15.
    • (g) Repairs of internal roads is in progress.
  • 2. Electrical.
    • (a) Work on laying of U/G cable for energizing the 66 KVA Substation for Sunny Enclave is in final stages. Terminal connections at ends of Sub Station & HT pole is the balance work. PDC as per PSPCL is 31 Oct 15. After energization of 66 KVA Substation, the power supply to Sunny Enclave including AFNHB Project will be changed over to Urban feeder from rural feeder and this will improve the power availability at the area with lesser power cuts.
    • (b) All the DG sets providing S/by supply to common facilities and DUs are functional in both Manual & Auto modes. Successful demonstration of their functionality was shown to the Society members on 30 Jul 15. The Lifts of all Towers are connected to S/By DG Sets and Stand by supply is also available to individual DUs, starting with the Towers of Airmen & Sailor. The Society has been requested to take over and operate/maintain the DG sets to meet requirements of the individuals.
  • 3. Lifts.
    • (a) All small lifts (8 Passenger) of all 26 Towers are functional.
    • (b) All large lifts (15 Passenger) are functional except for Towers E, M, P, Q, K, L & O. PDC for lifts of these towers is mid Oct 15.

NOTICE: FROM PRESIDENT GREATER MOHALI SOCIETY
1. GBM of JVTY Greater Mohali Apartment Owner’s Association will be held on 18 Oct 2014 at Community Centre-I at the project Site. 2. All allottees are requested to contact, Society for further details. The e-mail address of the society is presidentjvtymohali@gmail.com.

UPDATE ON AUDIT OF TILE - AFNHB GREATER MOHALI (KHARAR) PROJECT (Feb 14)

1. Consequent to the visit of DG, AFNHB and Principal Director (Wks) to the project on 01 & 02 Feb 14, a technical audit with the members from AFNHB, Project Staff, Contractor and tile manufacture was carried out from 04 Feb 14 to 16 Feb 14. The aim of the audit was to ascertain the requirement and identify the flats which have shade variation on the floor tiles. The team visited each and every flat except those found locked (Handed Over) in the 18 towers which have been offered to the allottees for taking over.
2. The comprehensive audit report has then been compiled and the total quantity of tile requirement ascertained. The required quantity has been intimated to the tile manufacturer i.e. M/s. Somany Tiles.
3. M/s. Somany has been instructed to carry out a thorough check of all its stocks which were supplied with similar shades, during the corresponding period when the tiles were supplied to Mohali project. Although few boxes have been located at Ahmadabad, these are very less compared to our requirement. M/s. Somany has sought one weeks� time i.e. upto 04 Mar 14 to carryout full search on all over India basis with their stockiest to locate similar shade tiles if available. Based on the total tiles located, these would then be brought to the Mohali Project and replacement in those flats where shade variations exists will be under taken. At the same time allottees are at liberty to locate matching tiles from the market (including other manufactures) and the tiles will be replaced.
4. Next update would be posted after 07 Mar 14 to appraise the status.

  • Update on Energisation (Last update as on 20 Dec 13).read more...

  • Equalization Charges: It is the amount of the equalization charges in the project collected from late joiners/defaulters as per the rates prescribed in the Master Brochure and Allotment Letter. To bring the parity among the allottees such charges, so collected, are ploughed back to the project for common benefit of all the allottees. In this project the equalization charges were freezed on 08 Jan 12 means no charges will be charged from the allottees who make the payments beyond this frozen date. Similarly, no equalization charges shall be charged from the allottees on the interim installment as called on 29 Apr/02 Jul 13.


  • A number of allottees of Greater Mohali Scheme, who have taken House Building Loan from Air Force Group Insurance Society, have approached this Board to take up a case for timely payment of the interim installment due on 29 Apr 13. Based on their request, a case is being taken up with AFGIS. Further communication to the affected allottees shall follow in due course of time.

  • REQUEST FROM ALLOTTEES FOR MUTUAL EXCHANGE ... more
    All allottees of Gr. Mohali are informed that the Possession of Dwelling Units at Project site has been commenced from 17 Dec 12 onwards for A, B, T, U, V and W block as per schedule given to the allottees. Allottees are requested to collect Possession letter from AFNHB, Delhi office, if not taken earlier, prior to the handing/ taking over of possession of DU at site. It is also informed that the last installment, as intimated earlier, can be paid either by cheque or demand draft or ICICI Bank Challan. It is to be ensured that the last installment is paid and credited to AFNHB Bank account if paid by cheque/ICICI Bank Challan prior to approaching AFNHB for possession letter. For this purpose the copy of Bank Account statement/Pass book is to be given at the time of collection of possession letter, through which the payment(s) is/are made by the allottee.
    STATUS:
    Inauguration
    The AFNHB Greater Mohali scheme was inaugurated by Air Mshl J N Burma PVSM AVSM VSM, AOA & Chairman AFNHB on 15 Nov 11 at 1100hrs. He was accompanied by R Adm R Gaikwad NM, Director General AFNHB. Approx. 350 allottees were present during the function including serving and retired Naval/Air Force Officers. The AOA visited the sample flats and had tea with the allottees. Thereafter, the Final Costing presentation was given by the DG AFNHB to the Allottees and finally the meeting concluded with vote of thanks.

    Procurement of Land

    ARCHITECT SELECTION

    • Architect for the Project: M/S. MODERN INDIA ARCHITECTS

    Award of Contract

    • Contractors for the Project are M/S. OPSM and M/S. SURINDRA BLDRS

    Available Dwelling Units And Configuration Details

    TYPE SUPER AREA (APPROX) IN SQ FT AVAILABLE DU TENTATIVE COST (RS.IN LAKH) ACCOMODATION
    AI 1970 01 66.00 DRAWING/DINING, THREE BEDROOMS, ONE SERVANT ROOM WITH FOUR ATTACHED TOILETS, BALCONIES & KITCHEN
    AII 1584 01 53.00 DRAWING/DINING, THREE BEDROOMS, ONE SERVANT ROOM WITH FOUR ATTACHED TOILETS, THREE BALCONIES & KITCHEN
    BI 938 03 31.50 DRAWING/DINING, TWO BEDROOMS, WITH TWO TOILETS, THREE BALCONIES & KITCHEN

    Photographs on progress etc.


    Block K and O

    UPDATE AS ON 21 MAY

    Latest Update

    Plan Type: A-II

    Plan Type: A-I

    Layout view

    Elevation View

    Location Map

    Foundation Stone laying ceremony as on 08 Mar 08
    Archive
    FACILITIES PLANNED:
    Parking in basement, Stilts, Podium and open. Two Community Centers. Two Swimming Pools. Jogging track and landscaping over basement and stilt roofs etc. Power backup for emergency services.

    Instalment Plan

    INSTALMENTS DUE DATE A-I A-II A-III B
    Registration 30 Sep 06 1.00 1.00 1.00 0.50
    I 05 Mar 07 4.28 3.30 2.50 1.50
    II 08 May 07 4.28 3.30 2.50 1.50
    III 05 Oct 07 3.03 2.38 1.92 1.50
    IV 05 Jun 08 3.03 2.38 1.92 1.50
    V 06 Oct 08 3.03 2.38 1.92 1.50
    VI 08 May 09 3.03 2.38 1.92 1.50
    VII 08 Sep 09 3.03 2.38 1.92 1.50
    VIII 08 Apr 10 3.03 2.38 1.92 1.50
    IX 3 Sep 10 3.04 2.42 1.92 1.54
    X 7 Apr 11 3.70 3.42 2.09 2.38
    Interim 29 Apr 13 /
    02 Jul 13*
    5.00 4.50 4.00 2.50
    For due amount please refer final call-up letter and Interim Installment.
    *Please refer Update dated 24 Jun 13 for details.

    Location of Project

    It is located on NH-21 and is about 15 Kms from Chandigarh Airport and 18 Km from Chandigarh Railway Station.