A DUs Status
(30 Apr 15)
Block A: Brickwork up to 9th floor 96% completed. Int. Electricity upto 9th floor only conducting 80%. Internal plaster upto 9th floor 92%. Door and Window frame installation work 56%. External plaster is 75% done, Sanitary Fitting (PPR & PVC) is 28%. Wall anf Floor Tile work is done 47%. Staircase and varanda finishing work (plaster) is 35% done.
Block B: Internal Plaster work up to 8th floor has been 96%. External plaster work has been 93% completed. Stair case and veranda finishing work 95% is completed. Internal conducting work is done 95%. Door and Window frame installation work 90%. Wall and floor Tiling, Marble, Granite work has been 80% done. Sanitary Fitting (PPR & PVC) is 77% done.
B. Common Areas Excavation and foundation of boundry wall 70% complete. Brick Work & plastering work of boundary wall 45% completed. 30% of basement slab and brick work has been done & 100% community centre slab and plaster work 75% of total area has been done. Ramp slab casting 35% has been done. Excavation of basement is 61% done. Casting of basement footings 48% has been done. Boundary wall work at backside and Aluminum making work is in progress.
  • JALANDHER PROJECT : No penal rate of interest by AFGIS for construction in progress. (14 Nov 2014). [Read more....]
  • Last opportunity for Air Force and Naval Personnel to apply for AFNHB Jalandhar Scheme (12 Mar 14). read more...
  • E-mail id of Project Director Jalandhar (Gp Capt Joshi) : jlr.afnhb@gmail.com
  • Confirmation from Allottees of Jalandhar Scheme, who have opted for two combined units. Read more...
  • Jalandhar Scheme is open for Registration (eligibility diluted) till 10 Sep 13. Read more...
  • Offer to existing Allottees for two adjind Attention : JALANDHAR PROJECT allottees. Read more ...
  • Defferment of VII Instalment from 9 Aug 13 to 09 Oct 13 : 6 Jun 13. more ...
  • Registration reopened for few vacancies, K-Broadcast dt 23 May 13. more ...
  • Suggestions of all Allottees for Jalandhar - Project. Please Read More ...
  • Click here for Technical Brochure....
  • Last Opportunity for Air Force and Naval Personnel to apply for AFNHB Jalandhar Scheme as eligibility diluted to include Serving Army And Coastguard Personnel. Regn. open till 01 May 13. read more ...
  • Sample Flat photographs Uploaded.
  • Sample flat meeting : Letter dated 23 Jan 2013. read more ...
  • Scheme opened for Registration till 28 Feb 2013. read more ...
  • Mysore and Jalandhar : Scheme Re-opened for Priority I to IV. Last date of Regn.30 Nov 12. more...
  • Revised Schedule of Installment.Letter dated:10 Sep 12. more...
  • Registration Re-opened for Priority I to IV for few vacancies. Last date of Regn.15 Sep 12. more...
  • Scheme Re-opened for Priority I to IV for few vacancies. Last date of Regn.15 Jul 12. Ref. K Broadcast (13 Jun 12)
  • Scheme Re-opened for Priority I to IV for few vacancies. Last date of Regn.30 Mar 12. Ref. K Broadcast (22 Feb 12)
  • Civil Contract awarded and construction commenced Sep 11.
  • Launch of Jalandhar Project : Letter dated 29 Sep 11. more...
  • Re-opened on first come first served basis for 31 vacancies in AI and 05 vacancies in B Category. more...
  • The Plan for the project has been decided and shall be intimated to all allaottees after approval by the Authority.
  • Aimed at providing decent housing facility to its personnel, the Air Force Naval Housing Board (AFNHB) has acquired 2.54 acres land in the city for constructing houses for the serving and retired personnel of the Indian Air Force and Indian Navy. Bhoomi Pujan was done and the foundation stone of this project was laid by Director General Air Force Naval Housing Board, Rear Admiral R Gaikwad on 30 Sep 11. He was accompanied by the Project Director, Group Captain PK Joshi, the architects and engineers of this project. Under this project the AFNHB would construct 154 flats in two tall towers. Rear Admiral R Gaikwad stated that the flats to be constructed were in the heart of the city. “This will be the first ever high rise housing complex of the city”. The flats would have a dedicated basement, stilt parking and contemporary specifications like glass lifts, swimming pools and a community centre. He said the flats would be completed within a stipulated time period of around two years.
  • TENTATIVE COST, AREA AND ACCOMMODATION
    Category Super Area (Tentative)
    No of DU
    Tentative Cost (Lacs) Tentative Accommodation
    Officers (Type A)
    1380 Sq Ft
    51.00
    Drawing/Dining Room, 3 Bedrooms, Kitchen, 2 Toilets and Balconies.
    Airmen/ Sailors (Type B)
    955 Sq Ft
    37.00
    Drawing/Dining Room, 2 Bedrooms, Kitchen, 2 Toilets and Balconies.
    INSTALMENT PLAN (Rs. in lacs)
    Instalment
    Due date
    A
    B
    Registration
    -
    1.01
    0.51
    I
    Already Called
    8.50
    5.00
    II
    Already Called
    8.50
    5.00
    III
    Already Called
    6.60
    5.30
    IV
    Already Called
    6.60
    5.30
    V
    10 Nov 12
    6.60
    5.30
    VI
    10 May 13
    6.60
    5.30
    VII
    09 Oct 13
    3.30
    2.65
    Final
    Will be intimated later
    Amount (inclusive of equalisation charges/taxes etc if any). Cost includes Service Tax payable to contractor, Parking and VAT.
















    Progress.









    Prog.Aug 12




    Prog.Sep12







    Prog.31Oct12







    Sample Flats



















    Prog. 1 Nov 14




    Prog. Jan 15

    Prpg.31 Jan 15.





    Prog. 16 Feb 15


    Prog 5 May 15