1. WORK ON ALL BLOCKS IN IN PROGRESS.
2. WORK ON 3 BLOCKS WAS DELAYED DUE TO WATER LINES PASSING OVER THE BLOCKS. NOW WATER LINES ARE
SHIFTED AND WORK ON THESE BLOCKS IS RESUMED.
3. SAMPLE FLATS FOR A-1 AND A-II CATEGORY SHALL BE READY BY END SEP 2008.
4. ALLOTTEE MEETING WILL BE CONDUCTED IN OCT 2008 FOR SAMPLE FLATS EXACT DATE SHALL BE INTIMATED
IN DUE COURSE.
5. THE COST OF STEEL HAS GONE VERY HIGH, Rs.48,500 PER METRIC TON AS AGAINST Rs.32,000 PER METRIC
TON. MID TERM COSTING IS BEING WORKED OUT AND SHALL BE INTIMATED SOON.
6. TECHNICAL BROCHURES WITH LATEST DETAIL OF FLATS, LAYOUT AND AREA HAS BEEN FORWARDED TO ALL ALLOTTEES.
7. OVERALL WORK IS ON SCHEDULE.
|